ENERGY_EFFICIENCY_IN_ELECTRICAL_UTILITIES (Chapter 9:Diesel / Natural Gas Power Generating System)

 

ENERGY_EFFICIENCY_IN_ELECTRICAL_UTILITIES  

(Chapter 9:Diesel / Natural Gas Power Generating System)

Introduction

Reciprocating engines produce electricity using a combustible fuel and generator. In addition to producing electricity, useful heat can be recovered from the exhaust gas using a heat recovery steam generator (HRSG), or heat recovery system for hot water (Figure 9.1). Heat can also be recovered from the lubricating oil cooler, the jacket water cooler and/or the charge air cooler, and this recovered “waste” heat can be provided to a heating load. In this case, the reciprocating engine power plant would be operating in a Combined Heat & Power (CHP) or cogeneration mode. The energy performance of a reciprocating engine is influenced by a number of factors such as the type of fuel, the reciprocating engine power capacity, minimum capacity, availability, heat rate and heat recovery efficiency.


There are two basic types of reciprocating engines - spark ignition and compression ignition. Spark ignition engines use a spark (across a spark plug) to ignite a compressed fuel-air mixture. Typical fuels for such engines are gasoline, natural gas and sewage and landfill gas. Compression ignition engines compress air to a high pressure, heating the air to the ignition temperature of the fuel, which then is injected. The high compression ratio used for compression ignition engines results in a higher efficiency
than is possible with spark ignition engines. Diesel/heavy fuel oil is normally used in compression ignition engines, although some are dual-fueled (natural gas is compressed with the combustion air and diesel oil is injected at the top of the compression stroke to initiate combustion).

Diesel Engine Cycle
Diesel engine is the prime mover, which drives an alternator to produce electrical energy. In the Diesel
engine, air is drawn into the cylinder and is compressed to a high ratio (14:1 to 25:1). During this compression, the air is heated to a temperature of 700—900°C. A metered quantity of diesel fuel is then injected into the cylinder, which ignites spontaneously because of the high temperature. Hence, the diesel engine is also known as compression ignition (CI) engine.
DG set can be classified according to cycle type as: two stroke and four stroke. However, the bulk of IC engines use the four stroke cycle. Let us look at the principle of operation of the four-stroke diesel engine.
The 4 stroke operations in a diesel engine (Figure 9.2) are: induction stroke, compression stroke,
ignition and power stroke and exhaust stroke.
1st:Induction stroke - while the inlet valve is open, the descending piston draws in fresh air.
2nd: Compression stroke - while the valves are closed, the air is compressed to a pressure of up to
25 bar.
3rd; Ignition and power stroke - fuel is injected, while the valves are closed (fuel injection actually
starts at the end of the previous stroke), the fuel ignites spontaneously and the piston is forced downwards by the combustion gases.
4th: Exhaust stroke - the exhaust valve is open and the rising piston discharges the spent gases from
the cylinder.


Since power is developed during only one stroke, the single cylinder four-stroke engine has a low degree of uniformity. Smoother running is obtained with multi cylinder engines because the cranks are staggered in relation to one another on the crankshaft. There are many variations of engine configuration, for example. 4 or 6 cylinder, in-line, horizontally opposed, vee or radial configurations.

Gas Engines

A typical spark-ignited lean-burn engine is depicted in Figure 9.3. In this process, the gas is mixed with air before the inlet valves. During the intake period, gas is also fed into a small prechamber, where the gas mixture is rich compared to the gas in the cylinder. At the end of the compression phase the gas/air mixture in the prechamber is ignited by a spark plug. The flames from the nozzle of the prechamber ignite the gas/air mixture in the whole cylinder. Combustion is fast. After the working phase the cylinder is emptied of exhaust and the process starts again. Reciprocating engines with modern lean-burn technology reach close to 45% electrical efficiency.

DG Set as a System

A diesel generating set (Figure 9.4) should be considered as a system since its successful operation

depends on the well-matched performance of the components, namely:

a) The diesel engine and its accessories.

b)The AC Generator.

c)The control systems and switchgear.

d)The foundation and power house civil works.

e)The connected load with its own components like heating, motor drives, lighting etc.

It is necessary to select the components with highest efficiency and operate them at their optimum

efficiency levels to conserve energy in this system.

Selection Considerations

To make a decision on the type of engine, which is most suitable for a specific application, several factors need to be considered. The two most important factors are: power and speed of the engine. The power requirement is determined by the maximum load. The engine power rating should be 10-20 % more than the power demand by the end use. This prevents overloading the machine by absorbing extra load during starting of motors or switching of some types of lighting systems or when wear and tear on the equipment pushes up its power consumption.

Speed is measured at the output shaft and given in revolutions per minute (RPM). An engine will operate over a range of speeds, with diesel engines typically running at lower speeds (1300 - 3000 RPM). There will be an optimum speed at which fuel efficiency will be greatest. Engines should be run as closely as possible to their rated speed to avoid poor efficiency and to prevent build up of engine deposits due to incomplete combustion - which will lead to higher maintenance and running costs. To determine the speed requirement of an engine, one has to again look at the requirement of the load. For some applications, the speed of the engine is not critical, but for other applications such as a generator, it is important to get a good speed match. If a good match can be obtained, direct coupling of engine and generator is possible; if not, then some form of gearing will be necessary - a gearbox or belt system, which will add to the cost and reduce the efficiency.

There are various other factors that have to be considered, when choosing an engine for a given application. These include the following: cooling system, abnormal environmental conditions (dust, dirt, etc.), fuel quality, speed governing (fixed or variable speed), poor maintenance, control system, starting equipment, drive type, ambient temperature, altitude, humidity, etc.

Suppliers or manufacturers literature will specify the required information when purchasing an engine. The efficiency of an engine depends on various factors, for example, load factor (percentage of full load), engine size, and engine type.

Diesel Generator Captive Power Plants

Diesel engine power plants are most frequently used in small power (captive non-utility) systems. The main reason for their extensive use is the higher efficiency of the diesel engines compared with gas turbines and small steam turbines in the output range considered. In applications requiring low captive power, without much requirement of process steam, the ideal method of power generation would be by installing diesel generator plants. The fuels burnt in diesel engines range from light distillates to residual fuel oils. Most frequently used diesel engine sizes are between the range 4 to 15 MW. For continuous operation, low speed diesel engine is more cost-effective than high speed diesel engine.

Advantages of adopting Diesel Power Plants are:

¢ Low installation cost

¢ Short delivery periods and installation period

¢ Higher efficiency (as high as 43 -45 %)

¢ More efficient plant performance under part loads

¢ Suitable for different type of fuels such as low sulphur heavy stock and heavy fuel oil in case of large capacities.

¢ Minimum cooling water requirements,

¢ Adopted with air cooled heat exchanger in areas where water is not available

¢ Short start up time

brief comparison of different types of captive power plants (combined gas turbine and steam turbine, conventional steam plant and diesel engine power plant) is given in Table 9.1. It can be seen from the Table that captive diesel plant wins over the other two in terms of thermal efficiency, capital cost, space requirements, auxiliary power consumption, plant load factor etc.


Diesel Engine Power Plant Developments

The diesel engine developments have been steady and impressive. The specific fuel consumption has come down from a value of 220 g/kWh in the 1970’s to a value of around 160 g/kWh in present times. Slow speed diesel engine, with its flat fuel consumption curve over a wide load range (50%-100%), compares very favorably over other prime movers such as medium speed diesel engine, steam turbines and gas turbines. With the arrival of modern, high efficiency turbochargers, it is possible to use an exhaust gas driven turbine generator (Figure 9.5) to further increase the engine rated output. The net result would be lower fuel consumption per kWh and further increase in overall thermal efficiency.

The diesel engine is able to burn the poorest quality fuel oils, unlike gas turbine, which is able to do so with only costly fuel treatment equipment.

Slow speed dual fuel engines are now available using high-pressure gas injection, which gives the same thermal efficiency and power output as a regular fuel oil engine.

Selection and Installation Factors
Sizing of a Genset:
a) If the DG set is required for 100% standby, then the entire connected load in HP/ kVA should be
added. After finding out the diversity factor, the correct capacity of a DG set can be found out.
Example :
Connected Load                         =                    650 kW
Diversity Factor                         =                    0.54
(Demand / Connected load)
Max. Demand                            =                      650x 0.54      = 350 kW
% Loading                                  =                     70
Set rating                                    =                      350/0.7         = 500 kW
At 0.8 PF, rating                         =                      625kVA

b) For an existing installation, record the current, voltage and power factors (kWh/kVAh) reading at the main bus-bar of the system at every half-an-hour interval for a period of 2-3 days and during this period the factory should be having its normal operations. The non-essential loads should be switched off to find the realistic current taken for running essential equipment. This will give a fair idea about the current taken from which the rating of the set can be calculated
For existing installation:
c) For a new installation, an approximate method of estimating the capacity of a DG set is to add full load currents of all the proposed loads to be run in DG set. Then, applying a diversity factor depending on the industry, process involved and guidelines obtained from other similar units, correct capacity can be arrived at.

High Speed Engine or Slow/Medium Speed Engine
The normal accepted definition of high speed engine is 1500 rpm. The high speed sets have been developed in India, whereas the slow speed engines of higher capacities are often imported. The other features and comparison between high and medium / slow speed engines are mentioned in Table 9.2 below:
Keeping the above factors and available capacities of DG set in mind, the cost of economics for both
the engines should be worked out before arriving at a decision.

Capacity Combinations
From the point of view of space, operation, maintenance and initial capital investment, it is certainly economical to go in for one large DG set than two or more DG sets in parallel.Two or more DG sets running in parallel can be a advantage as only the short-fall in power —depending upon the extent of power cut prevailing - needs to filled up. Also, flexibility of operation is increased since one DG set can be stopped, while the other DG set is generating at least 50% of the power requirement. Another advantage is that one DG set can become 100% standby during lean and low power-cut periods.

Air Cooling Vs. Water Cooling
The general feeling has been that a water cooled DG set is better than an air cooled set, as most users are worried about the overheating of engines during summer months. This is to some extent is true and precautions have to be taken to ensure that the cooling water temperature does not exceed the prescribed limits. However, from performance and maintenance point of view, water and air cooled sets are equally good except that proper care should be taken to ensure cross ventilation so that as much cool air as possible is circulated through the radiator to keep its cooling water temperature within
limits.
While, it may be possible to have air cooled engines in the lower capacities, it will be necessary to go in for water cooled engines in larger capacities to ensure that the engine does not get over-heated during summer months.

Safety Features
It is advisable to have short circuit, over load and earth fault protection on all the DG sets. However, in case of smaller capacity DG sets, this may become uneconomical. Hence, it is strongly recommended to install a circuit protection. Other safety equipment like high temperature, low lube oil pressure cutouts should be provided, so that in the event of any of these abnormalities, the engine would stop and prevent damage. It is also essential to provide reverse power relay when DG sets are to run in parallel to avoid back feeding from one alternator to another.

Parallel Operation with Grid
Running the DG set in parallel with the mains from the supply undertakings can be done in consultation with concerned electricity authorities. However, some supply undertakings ask the consumer to give an undertaking that the DG set will not be run in parallel with their supply. The reasons stated are that the grid is an infinite bus and paralleling a small capacity DG set would involve operational risks despite normal protections like reverse power relay, voltage and frequency relays.

Maximum Single Load on DG Set
The starting current of squirrel cage induction motors is as much as six times the rated current for a few seconds with direct-on-line starters. In practice, it has been found that the starting current value should not exceed 200 % of the full load capacity of the alternator. The voltage and frequency throughout the motor starting interval recovers and reaches rated values usually much before the motor has picked up full speed.

In general, the HP of the largest motor that can be started with direct on line starting is about 50 % of
the kVA rating of the generating set. On the other hand, the capacity of the induction motor can be
increased, if the type of starting is changed over to star delta or to auto transformer starter, and with
this starting the HP of the largest motor can be upto 75 % of the kVA of Genset.

Unbalanced Load Effects
It is always recommended to have the load as much balanced as possible, since unbalanced loads can cause heating of the alternator, which may result in unbalanced output voltages. The maximum unbalanced load between phases should not exceed 10 % of the capacity of the generating sets.

Neutral Earthing
The electricity rules clearly specify that two independent earths to the body and neutral should be provided to give adequate protection to the equipment in case of an earth fault, and also to drain away
any leakage of potential from the equipment to the earth for safe working.

Site Condition Effects on Performance Derating
Site condition with respect to altitude, intake temperature, cooling water temperature and derate diesel
engine output as shown in following Tables: 9.3 and 9.4.

Operational Factors
Load Pattern & DG Set Capacity
The average load can be easily assessed by logging the current drawn at the main switchboard on an average day. The ‘over load’ has a different meaning when referred to the D.G. set. Overloads, which appear insignificant and harmless on electricity board supply, may become detrimental to a D.G.set, and hence overload on D.G.set should be carefully analysed. Diesel engines are designed for 10% overload for | hour in every 12 hours of operation. The A.C. generators are designed to meet 50% overload for 15 seconds as specified by standards. The D.G.set/s selection should be such that the overloads are within the above specified limits. It would be ideal to connect steady loads on DG set to ensure good performance. Alongside alternator loading, the engine loading in terms of kW or BHP, needs to be maintained above 50%. Ideally, the engine and alternator loading conditions are both to be achieved towards high efficiency.
Engine manufacturers offer curves indicating % Engine Loading vs fuel Consumption in grams/BHP. Optimal engine loading corresponding to best operating point is desirable for energy efficiency. Alternators are sized for kVA rating with highest efficiency attainable at a loading of around 70% and more. Manufacturer’s curves can be referred to for best efficiency point and corresponding kW and kVA loading values.

Sequencing of Loads

The captive diesel generating set has certain limits in handling the transient loads. This applies to both kW (as reflected on the engine) and kVA (as reflected on the generator). In this context, the base load that exists before the application of transient load brings down the transient load handling capability, and in case of A.C. generators, it increases the transient voltage dip. Hence, great care is required in sequencing the load on D.G:set/s. It is advisable to start the load with highest transient kVA first followed by other loads in the descending order of the starting kVA. This will lead to optimum sizing and better utilisation of transient load handling capacity of D.G.set.

Load Pattern

In many cases, the load will not be constant throughout the day. If there is substantial variation in load, then consideration should be given for parallel operation of D.G.sets. In such a situation, additional D.G. set(s) are to be switched on when load increases. The typical case may be an establishment demanding substantially different powers in first, second and third shifts. By parallel operation, D.G. sets can be run at optimum operating points or near about, for optimum fuel consumption and additionally, flexibility is built into the system. This scheme can be also be applied where loads can be segregated as critical and non-critical loads to provide standby power to critical load in the captive power system.

Load Characteristics

Some of the load characteristics influence efficient use of D.G.set. These characteristics are entirely load dependent and cannot be controlled by the D.G.set. The extent of detrimental influence of these characteristics can be reduced in several cases.

o) Power Factor:

The load power factor is entirely dependent on the load. The A.C. generator is designed for the power factor of 0.8 lag as specified by standards. Lower power factor demands higher excitation currents and results in increased losses. Over sizing A.C. generators for operation at lower power factors results in lower operating efficiency and higher costs. The economical alternative is to provide power factor improvement capacitors.

o) Unbalanced Load:

Unbalanced loads on A.C. generator leads to unbalanced set of voltages and additional heating in A.C. generator. When other connected loads like motor loads are fed with unbalanced set of voltages additional losses occur in the motors as well. Hence, the load on the A.C. generators should be  alanced as far as possible. Where single phase loads are predominant, consideration should be given for  procuring single phase A.C. generator.

° Transient Loading:

On many occasions to contain transient voltage dip arising due to transient load application, a specially designed generator may have to be selected. Many times an unstandard combination of engine and A.C. generator may have to be procured. Such a combination ensures that the prime mover is not unnecessarily over sized which adds to capital cost and running cost. 

° Special Loads:

Special loads like rectifier / thyristor loads, welding loads, furnace loads need an application check. The manufacturer of diesel engine and AC generator should be consulted for proper recommendation so that desired utilisation of DG set is achieved without any problem. In certain cases of loads, which are sensitive to voltage, frequency regulation, voltage wave form, consideration should be given to segregate the loads, and feed it by a dedicated power supply which usually assumes the form of DG motor driven generator set. Such an alternative ensures that special design of AC generator is restricted to that portion of the load which requires high purity rather than increasing the price of the D.G.set by specially designed AC generator for complete load.

Waste Heat Recovery in DG Sets

For combined heat and power applications, waste heat from reciprocating engines can be tapped mainly from exhaust gases and cooling water that circulates around cylinders in the engine jackets, with additional potential from oil and turbo coolers. While engine exhaust and cooling water each provide about half of the useful thermal energy, the exhaust is at much higher temperature (around 450 °C versus 100 °C) and hence is more versatile. A typical energy balance in a reciprocating engine generator using Diesel and Natural gas is given in Table 9.5 below.

The table reveals that for natural gas generator more thermal energy (54%) can be recovered from the reciprocating engine compared to an electrical energy conversion of 30%. It would be realistic to assess the Waste Heat Recovery (WHR) potential in relation to quantity, temperature margin, in kcal/hr as:

Where, tg is the gas temperature after Turbocharger, (the criteria being that limiting exit gas temperature cannot be less than 180°C, to avoid acid dew point corrosion), 0.25 being the specific heat of flue gases and kWh output being the actual average unit generation from the set per hour. For a 1100 kVA set, at 800 kW loading, and with 480°C exhaust gas temperature, the waste heat potential works out to:

While the above method yields only the potential for heat recovery, the actual realisable potential depends upon various factors and if applied judiciously, a well configured waste heat recovery system can tremendously boost the economics of captive DG power generation. The factors affecting Waste Heat Recovery from flue Gases are:

a) DG Set loading, temperature of exhaust gases 

b) Hours of operation and

c) Back pressure on the DG set

Consistent DG set loading (to over 60% of rating) would ensure a reasonable exit flue gas quantity and temperature. Fluctuations and gross under loading of DG set results in erratic flue gas quantity and temperature profile at entry to heat recovery unit, thereby leading to possible cold end corrosion and other problems. Typical flue gas temperature and flow pattern ina 5 MW DG set at various loads are given in Table 9.6.


* Number of hours of operation of the DG Set has an influence on the thermal performance of waste heat Recovery unit. With continuous DG Set operations, cost benefits are favourable.

* Back pressure in the gas path caused by additional pressure drop in waste heat recovery unit is another key factor. Generally, the maximum back pressure allowed is around 250-300 mmWC and the heat recovery unit should have a pressure drop lower than that. Choice of convective waste heat recovery systems with adequate heat transfer area are known to provide reliable service.

The configuration of heat recovery system and the choice of steam parameters can be judiciously selected with reference to the specific industry (site) requirements. Much good work has taken place in Indian Industry regarding waste heat recovery and one interesting configuration, deployed is installation of waste heat boiler in flue gas path along with a vapour absorption chiller, to produce 8°C chilled water working on steam from waste heat.

Energy Performance Assessment of DG Sets

Routine energy efficiency assessment of DG sets on shop floor involves following typical steps:

1) Ensure reliability of all instruments used for trial.

2) Collect technical literature, characteristics, and specifications of the plant.

3) Conduct a 2 hour trial on the DG set, ensuring a steady load, wherein the following measurements are logged at 15 minutes intervals.

a) Fuel consumption (by dip level or by flow meter)

b) Amps, volts, PF, kW, kWh

c) Intake air temperature, Relative Humidity (RH)

d) Intake cooling water temperature

e) Cylinder-wise exhaust temperature (as an indication of engine loading)

f) Turbocharger RPM (as an indication of loading on engine)

g) Charge air pressure (as an indication of engine loading)

h) Cooling water temperature before and after charge air cooler (as an indication of cooler performance)

i) Stack gas temperature before and after turbocharger (as an indication of turbocharger performance)

4) The fuel oil/diesel analysis is referred to from an oil company data.

5) Analysis: The trial data is to be analysed with respect to:

a) Average alternator loading.

b) Average engine loading.

c)Percentage loading on alternator.

d)Percentage loading on engine.

e)Specific power generation kWh/liter.

f)Comments on Turbocharger performance based on RPM and gas temperature difference.

g)Comments on charge air cooler performance.

h)Comments on load distribution among various cylinders (based on exhaust temperature, the temperature to be + 5% of mean and high/low values indicate disturbed condition).

i) Comments on housekeeping issues like drip leakages, insulation, vibrations, etc.

format as shown in the Table 9.7 is useful for monitoring the performance

Energy Saving Measures for DG Sets

1.Ensure steady load conditions on the DG set, and provide cold, dust free air at intake (use of air washers for large sets, in case of dry, hot weather, can be considered).

2.Improve air filtration.

3.Ensure fuel oil storage, handling and preparation as per manufacturer’s guidelines/oil company data.

4.Consider fuel oil additives in case they benefit fuel oil properties for DG set usage.

5.Calibrate fuel injection pumps frequently.

6.Ensure compliance with maintenance checklist.

7.Ensure steady load conditions, avoiding fluctuations, imbalance in phases, harmonic loads.

8.In case of a base load operation, consider waste heat recovery system adoption for steam generation or refrigeration chiller unit incorporation. Even the Jacket Cooling Water is amenable for heat recovery, vapour absorption system adoption.

9.In terms of fuel cost economy, consider partial use of biomass gas for generation. Ensure tar removal from the gas for improving availability of the engine in the long run.

10.Consider parallel operation among the DG sets for improved loading and fuel economy thereof.

11.Carryout regular field trials to monitor DG set performance, and maintenance planning as per requirements.

Solved Example:
1.A 180 kVA, 0.80 PF rated DG set has diesel engine rating of 210 BHP. What is the maximum power factor which can be maintained at full load on the alternator without overloading the DG set? (Assume alternator losses and exciter power requirement as 5.66 kW and there is no derating of DG set)

Ans:

Engine rated Power = 210x 0.746 = 156.66 kW

Rated power available for alternator = 156.66-5.66 = 151kW

Maximum power factor possible = 151/180 = 0.84

2. DG set is operating at 600 kW load with 450°C exhaust gas temperature. The DG set generates 8 kg of exhaust gas/ kWh generated. The specific heat of gas at 450°C is 0.25 kcal/ kg°C. A heat recovery boiler is installed after which the exhaust temperature drops to 230°C. How much steam will be generated at 3 kg/ cm? with enthalpy of 650.57 kcal/ kg. Assume boiler feed water temperature as 80°C.

Ans:

Waste Heat Recovery = 600 kWh x 8 kg gas generated/ kWh output x 0.25 kcal/kg °C x (450°C- 230°C) =2,64,000 kcal/hr

Steam generation = 2,64,000 kCal/hr / (650.57 — 80) = 462.7 kg/ hr.

-----------------------

Chapter 8

Chapter 10







Comments

Followers

Popular posts from this blog

Welder qualification procedure as per ASME Sec IX

  WELDER QUALIFICATON PROCEDURE (FOR PLATE &PIPING) 1.      Test positions for performance qualification 1.1   Positions (Groove weld) plate & pipe: - An angular deviation of plus or minus 15° From specified horizontal and vertical planes is permitted during welding. Position for qualification as per ASME IX QW-461.3 & QW-461.4 Table. 1 Plate Positions Pipe Positions a)        Vertical Position 3G (Fig.1a) b)        Overhead Positions 6G- (Fig.1b)   b) Overhead Position 4G (Fig.1a)               Fig. 1 Position of test peace for Groove weld (Plate & Pipe). 1.2   Test Positions for Fillet Welds: - An angular deviation of plus or minus 15° from the specified horizontal and vertical planes is permitted during welding. Position for qualification as per ASME QW-461.5 Table.2 Fillet joint Positions         a)   Vertical 3F        b)

Lathe machine

                                                       TYPES OF LATHE  Lathes are manufactured in a variety of types and sizes, from very small bench lathes used for precision work to huge lathes used for turning large steel shafts. But the principle of operation and function of all types of lathes is same. The different types of lathes are: 1. Speed lathe ( a ) Wood working ( b ) Spinning ( c ) Centering ( d ) Po1ishing   2. Centre or engine lathe ( a ) Be1t drive ( b ) Individual motor drive ( c ) Gear head lathe   3. Bench lathe   4. Tool room Lathe   5. Capstan and Turret 1athe   6. Special purpose lathe ( a ) Whee1 lathe ( b ) Gap bed lathe ( c ) Dup1icating lathe ( d ) T-lathe   7.Automatic lathe Speed Lathe Speed lathe is simplest of all types of lathes in construction and operation. The important parts of speed lathe are following- (1) Bed (2) Headstock (3) Tailstock, and (4) Tool post mounted on an adjustable slide.   It has no

Minimum required thickness of process pipeline (Engineering calculation)

Pressure Calculation Calculator:Minimum required thickness of pipeline for service as per ASME B31.3 Design Pressure (PSI): Diameter (inch): Stress 'S' (PSI): Quality Factor 'E': Weld Joint Reduction Factor 'W': Coefficient 'Y': Calculate Results: Min. Reqired Thickness tm (inch): 12.5% Allowance (inch): Mini. Required Thicknes (mm): After getting 12.5% allowance (inch) value again check ASME B36.10 or API 574 piping thickness table and choose thicknes value higher then this value for service. Calculating the Minimum Required Thickness of Pipelines for Service as per ASME B31.3 Introduction: In the field of engineering, designing safe and reliable pipelines is of utmost importance. The American Society of Mechanical Engineers (ASME) B31.3 code provides guidelines for the design and construction of process piping systems. One cr

Ultrasonic Flaw Detection: Unveiling the Power of Sound in Non-Destructive Testing

Introduction: Non-destructive testing (NDT) techniques play a vital role in ensuring the integrity and safety of structures, materials, and components in various industries. Among the array of NDT methods available, ultrasonic flaw detection stands out as a powerful and versatile technique. In this blog, we will explore the fundamentals of ultrasonic flaw detection, its applications, and the benefits it offers in detecting and characterizing defects without causing damage. Join us as we dive into the world of sound waves and their ability to reveal hidden flaws. 1. Understanding Ultrasonic Flaw Detection: 1.1 The Basics of Ultrasonics: We'll introduce the principles of ultrasonics, explaining how sound waves are generated, propagated, and detected. 1.2 Interaction with Materials: We'll explore how ultrasonic waves interact with different materials, including their reflection, transmission, and absorption behaviors. 2. How Ultrasonic Flaw Detection Works: 2.1 Transducers: We'

Calculator: Remaining Thickness of Pressure vessel API 510 (Identify remaining thickness is safe/unsafe)

Thickness Calculation Remaining Thickness of Pressure vessel to identify safe for service Design Pressure (psi): Radius (inch): Stress (psi) ASME Sec VIII Div 1: Efficiency 'E': T(nominal) (inch): Metal Loss (inch): Calculate   Remaining Thickness of Pressure vessel API 510  (Identify remaining thickness is safe/unsafe) Introduction: In the field of pressure vessel inspection and maintenance, determining the remaining thickness of the vessel is of utmost importance. This calculation helps assess the structural integrity of the vessel and ensures its safe operation. In this blog post, we will explore the method for calculating the remaining thickness of a pressure vessel as per API 510 standards. Formula for Minimum Thickness (Tmin): The API 510 standard

Purging Gas in Gas Tungsten Arc Welding: Enhancing Weld Quality and Integrity

Introduction: In the realm of welding, achieving high-quality welds with excellent integrity is paramount. One crucial technique that aids in this endeavor is the use of purging gas. Purging gas plays a vital role in preventing oxidation and ensuring a clean, controlled environment during welding. In this blog, we will explore the significance of purging gas, its purpose, techniques, and benefits in various welding applications. Join us as we delve into the world of purging gas and its impact on weld quality. Back purging is most important phenomenon in GTAW process because this process is mostly used in Stainless steel. Stainless steel is widely used fabrication of chemical, petrochemical, food etc. plant. All thin section and root welding is performed by GTAW process. GTAW process is also very popular in Aluminum welding. In all large diameter pipe the root pass welding is done by GTAW process where the back purging is mandatory. Purging gas protect the weld metal fro

Energy efficiency in Thermal utilities (Chapter 3: Steam System)

  Energy efficiency in Thermal utilities  (Chapter 3: Steam System) Introduction  Steam has been a popular mode of conveying energy since the industrial revolution. Steam is used for generating power and also used in process industries such as sugar, paper, fertilizer, refineries, petrochemicals, chemical, food, synthetic fiber and textiles. The following characteristics of steam make it so popular and useful to the industry:  ¢ Highest specific heat and latent heat ¢ Highest heat transfer coefficient e Easy to control and distribute Cheap and inert   Properties of Steam  Water can exist in the form of solid, liquid and gas as ice, water and steam respectively. If heat energy is added to water, its temperature rises until a value is reached at which the water can no longer exist as a liquid. We call this the “saturation” point and with any further addition of energy, some of the water will boil off as steam. This evaporation requires relatively large amounts of energy, and whil