ENERGY_EFFICIENCY_IN_ELECTRICAL_UTILITIES
(Chapter 9:Diesel / Natural Gas Power Generating System)
Introduction
Reciprocating engines produce electricity using a combustible fuel and generator. In addition to producing electricity, useful heat can be recovered from the exhaust gas using a heat recovery steam generator (HRSG), or heat recovery system for hot water (Figure 9.1). Heat can also be recovered from the lubricating oil cooler, the jacket water cooler and/or the charge air cooler, and this recovered “waste” heat can be provided to a heating load. In this case, the reciprocating engine power plant would be operating in a Combined Heat & Power (CHP) or cogeneration mode. The energy performance of a reciprocating engine is influenced by a number of factors such as the type of fuel, the reciprocating engine power capacity, minimum capacity, availability, heat rate and heat recovery efficiency.
Since power is developed during only one stroke, the single cylinder four-stroke engine has a low degree of uniformity. Smoother running is obtained with multi cylinder engines because the cranks are staggered in relation to one another on the crankshaft. There are many variations of engine configuration, for example. 4 or 6 cylinder, in-line, horizontally opposed, vee or radial configurations.
Gas Engines
A typical spark-ignited lean-burn engine is depicted in Figure 9.3. In this process, the gas is mixed with air before the inlet valves. During the intake period, gas is also fed into a small prechamber, where the gas mixture is rich compared to the gas in the cylinder. At the end of the compression phase the gas/air mixture in the prechamber is ignited by a spark plug. The flames from the nozzle of the prechamber ignite the gas/air mixture in the whole cylinder. Combustion is fast. After the working phase the cylinder is emptied of exhaust and the process starts again. Reciprocating engines with modern lean-burn technology reach close to 45% electrical efficiency.
DG Set as a System
A diesel generating set (Figure 9.4) should be considered as a system since its successful operation
depends on the well-matched performance of the components, namely:
a) The diesel engine and its accessories.
b)The AC Generator.
c)The control systems and switchgear.
d)The foundation and power house civil works.
e)The connected load with its own components like heating, motor drives, lighting etc.
It is necessary to select the components with highest efficiency and operate them at their optimum
efficiency levels to conserve energy in this system.
Selection Considerations
To make a decision on the type of engine, which is most suitable for a specific application, several factors need to be considered. The two most important factors are: power and speed of the engine. The power requirement is determined by the maximum load. The engine power rating should be 10-20 % more than the power demand by the end use. This prevents overloading the machine by absorbing extra load during starting of motors or switching of some types of lighting systems or when wear and tear on the equipment pushes up its power consumption.
Speed is measured at the output shaft and given in revolutions per minute (RPM). An engine will operate over a range of speeds, with diesel engines typically running at lower speeds (1300 - 3000 RPM). There will be an optimum speed at which fuel efficiency will be greatest. Engines should be run as closely as possible to their rated speed to avoid poor efficiency and to prevent build up of engine deposits due to incomplete combustion - which will lead to higher maintenance and running costs. To determine the speed requirement of an engine, one has to again look at the requirement of the load. For some applications, the speed of the engine is not critical, but for other applications such as a generator, it is important to get a good speed match. If a good match can be obtained, direct coupling of engine and generator is possible; if not, then some form of gearing will be necessary - a gearbox or belt system, which will add to the cost and reduce the efficiency.
There are various other factors that have to be considered, when choosing an engine for a given application. These include the following: cooling system, abnormal environmental conditions (dust, dirt, etc.), fuel quality, speed governing (fixed or variable speed), poor maintenance, control system, starting equipment, drive type, ambient temperature, altitude, humidity, etc.
Suppliers or manufacturers literature will specify the required information when purchasing an engine. The efficiency of an engine depends on various factors, for example, load factor (percentage of full load), engine size, and engine type.
Diesel Generator Captive Power Plants
Diesel engine power plants are most frequently used in small power (captive non-utility) systems. The main reason for their extensive use is the higher efficiency of the diesel engines compared with gas turbines and small steam turbines in the output range considered. In applications requiring low captive power, without much requirement of process steam, the ideal method of power generation would be by installing diesel generator plants. The fuels burnt in diesel engines range from light distillates to residual fuel oils. Most frequently used diesel engine sizes are between the range 4 to 15 MW. For continuous operation, low speed diesel engine is more cost-effective than high speed diesel engine.
Advantages of adopting Diesel Power Plants are:
¢ Low installation cost
¢ Short delivery periods and installation period
¢ Higher efficiency (as high as 43 -45 %)
¢ More efficient plant performance under part loads
¢ Suitable for different type of fuels such as low sulphur heavy stock and heavy fuel oil in case of large capacities.
¢ Minimum cooling water requirements,
¢ Adopted with air cooled heat exchanger in areas where water is not available
¢ Short start up time
brief comparison of different types of captive power plants (combined gas turbine and steam turbine, conventional steam plant and diesel engine power plant) is given in Table 9.1. It can be seen from the Table that captive diesel plant wins over the other two in terms of thermal efficiency, capital cost, space requirements, auxiliary power consumption, plant load factor etc.
Diesel Engine Power Plant Developments
The diesel engine developments have been steady and impressive. The specific fuel consumption has come down from a value of 220 g/kWh in the 1970’s to a value of around 160 g/kWh in present times. Slow speed diesel engine, with its flat fuel consumption curve over a wide load range (50%-100%), compares very favorably over other prime movers such as medium speed diesel engine, steam turbines and gas turbines. With the arrival of modern, high efficiency turbochargers, it is possible to use an exhaust gas driven turbine generator (Figure 9.5) to further increase the engine rated output. The net result would be lower fuel consumption per kWh and further increase in overall thermal efficiency.
The diesel engine is able to burn the poorest quality fuel oils, unlike gas turbine, which is able to do so with only costly fuel treatment equipment.
Slow speed dual fuel engines are now available using high-pressure gas injection, which gives the same thermal efficiency and power output as a regular fuel oil engine.
Sequencing of Loads
The captive diesel generating set has certain limits in handling the transient loads. This applies to both kW (as reflected on the engine) and kVA (as reflected on the generator). In this context, the base load that exists before the application of transient load brings down the transient load handling capability, and in case of A.C. generators, it increases the transient voltage dip. Hence, great care is required in sequencing the load on D.G:set/s. It is advisable to start the load with highest transient kVA first followed by other loads in the descending order of the starting kVA. This will lead to optimum sizing and better utilisation of transient load handling capacity of D.G.set.
Load Pattern
In many cases, the load will not be constant throughout the day. If there is substantial variation in load, then consideration should be given for parallel operation of D.G.sets. In such a situation, additional D.G. set(s) are to be switched on when load increases. The typical case may be an establishment demanding substantially different powers in first, second and third shifts. By parallel operation, D.G. sets can be run at optimum operating points or near about, for optimum fuel consumption and additionally, flexibility is built into the system. This scheme can be also be applied where loads can be segregated as critical and non-critical loads to provide standby power to critical load in the captive power system.
Load Characteristics
Some of the load characteristics influence efficient use of D.G.set. These characteristics are entirely load dependent and cannot be controlled by the D.G.set. The extent of detrimental influence of these characteristics can be reduced in several cases.
o) Power Factor:
The load power factor is entirely dependent on the load. The A.C. generator is designed for the power factor of 0.8 lag as specified by standards. Lower power factor demands higher excitation currents and results in increased losses. Over sizing A.C. generators for operation at lower power factors results in lower operating efficiency and higher costs. The economical alternative is to provide power factor improvement capacitors.
o) Unbalanced Load:
Unbalanced loads on A.C. generator leads to unbalanced set of voltages and additional heating in A.C. generator. When other connected loads like motor loads are fed with unbalanced set of voltages additional losses occur in the motors as well. Hence, the load on the A.C. generators should be alanced as far as possible. Where single phase loads are predominant, consideration should be given for procuring single phase A.C. generator.
° Transient Loading:
On many occasions to contain transient voltage dip arising due to transient load application, a specially designed generator may have to be selected. Many times an unstandard combination of engine and A.C. generator may have to be procured. Such a combination ensures that the prime mover is not unnecessarily over sized which adds to capital cost and running cost.
° Special Loads:
Special loads like rectifier / thyristor loads, welding loads, furnace loads need an application check. The manufacturer of diesel engine and AC generator should be consulted for proper recommendation so that desired utilisation of DG set is achieved without any problem. In certain cases of loads, which are sensitive to voltage, frequency regulation, voltage wave form, consideration should be given to segregate the loads, and feed it by a dedicated power supply which usually assumes the form of DG motor driven generator set. Such an alternative ensures that special design of AC generator is restricted to that portion of the load which requires high purity rather than increasing the price of the D.G.set by specially designed AC generator for complete load.
Waste Heat Recovery in DG Sets
For combined heat and power applications, waste heat from reciprocating engines can be tapped mainly from exhaust gases and cooling water that circulates around cylinders in the engine jackets, with additional potential from oil and turbo coolers. While engine exhaust and cooling water each provide about half of the useful thermal energy, the exhaust is at much higher temperature (around 450 °C versus 100 °C) and hence is more versatile. A typical energy balance in a reciprocating engine generator using Diesel and Natural gas is given in Table 9.5 below.
The table reveals that for natural gas generator more thermal energy (54%) can be recovered from the reciprocating engine compared to an electrical energy conversion of 30%. It would be realistic to assess the Waste Heat Recovery (WHR) potential in relation to quantity, temperature margin, in kcal/hr as:
While the above method yields only the potential for heat recovery, the actual realisable potential depends upon various factors and if applied judiciously, a well configured waste heat recovery system can tremendously boost the economics of captive DG power generation. The factors affecting Waste Heat Recovery from flue Gases are:
a) DG Set loading, temperature of exhaust gases
b) Hours of operation and
c) Back pressure on the DG set
Consistent DG set loading (to over 60% of rating) would ensure a reasonable exit flue gas quantity and temperature. Fluctuations and gross under loading of DG set results in erratic flue gas quantity and temperature profile at entry to heat recovery unit, thereby leading to possible cold end corrosion and other problems. Typical flue gas temperature and flow pattern ina 5 MW DG set at various loads are given in Table 9.6.
* Number of hours of operation of the DG Set has an influence on the thermal performance of waste heat Recovery unit. With continuous DG Set operations, cost benefits are favourable.
* Back pressure in the gas path caused by additional pressure drop in waste heat recovery unit is another key factor. Generally, the maximum back pressure allowed is around 250-300 mmWC and the heat recovery unit should have a pressure drop lower than that. Choice of convective waste heat recovery systems with adequate heat transfer area are known to provide reliable service.
The configuration of heat recovery system and the choice of steam parameters can be judiciously selected with reference to the specific industry (site) requirements. Much good work has taken place in Indian Industry regarding waste heat recovery and one interesting configuration, deployed is installation of waste heat boiler in flue gas path along with a vapour absorption chiller, to produce 8°C chilled water working on steam from waste heat.
Energy Performance Assessment of DG Sets
Routine energy efficiency assessment of DG sets on shop floor involves following typical steps:
1) Ensure reliability of all instruments used for trial.
2) Collect technical literature, characteristics, and specifications of the plant.
3) Conduct a 2 hour trial on the DG set, ensuring a steady load, wherein the following measurements are logged at 15 minutes intervals.
a) Fuel consumption (by dip level or by flow meter)
b) Amps, volts, PF, kW, kWh
c) Intake air temperature, Relative Humidity (RH)
d) Intake cooling water temperature
e) Cylinder-wise exhaust temperature (as an indication of engine loading)
f) Turbocharger RPM (as an indication of loading on engine)
g) Charge air pressure (as an indication of engine loading)
h) Cooling water temperature before and after charge air cooler (as an indication of cooler performance)
i) Stack gas temperature before and after turbocharger (as an indication of turbocharger performance)
4) The fuel oil/diesel analysis is referred to from an oil company data.
5) Analysis: The trial data is to be analysed with respect to:
a) Average alternator loading.
b) Average engine loading.
c)Percentage loading on alternator.
d)Percentage loading on engine.
e)Specific power generation kWh/liter.
f)Comments on Turbocharger performance based on RPM and gas temperature difference.
g)Comments on charge air cooler performance.
h)Comments on load distribution among various cylinders (based on exhaust temperature, the temperature to be + 5% of mean and high/low values indicate disturbed condition).
i) Comments on housekeeping issues like drip leakages, insulation, vibrations, etc.
format as shown in the Table 9.7 is useful for monitoring the performance
Energy Saving Measures for DG Sets
1.Ensure steady load conditions on the DG set, and provide cold, dust free air at intake (use of air washers for large sets, in case of dry, hot weather, can be considered).
2.Improve air filtration.
3.Ensure fuel oil storage, handling and preparation as per manufacturer’s guidelines/oil company data.
4.Consider fuel oil additives in case they benefit fuel oil properties for DG set usage.
5.Calibrate fuel injection pumps frequently.
6.Ensure compliance with maintenance checklist.
7.Ensure steady load conditions, avoiding fluctuations, imbalance in phases, harmonic loads.
8.In case of a base load operation, consider waste heat recovery system adoption for steam generation or refrigeration chiller unit incorporation. Even the Jacket Cooling Water is amenable for heat recovery, vapour absorption system adoption.
9.In terms of fuel cost economy, consider partial use of biomass gas for generation. Ensure tar removal from the gas for improving availability of the engine in the long run.
10.Consider parallel operation among the DG sets for improved loading and fuel economy thereof.
11.Carryout regular field trials to monitor DG set performance, and maintenance planning as per requirements.
Solved Example:
1.A 180 kVA, 0.80 PF rated DG set has diesel engine rating of 210 BHP. What is the maximum power factor which can be maintained at full load on the alternator without overloading the DG set? (Assume alternator losses and exciter power requirement as 5.66 kW and there is no derating of DG set)
Ans:
Engine rated Power = 210x 0.746 = 156.66 kW
Rated power available for alternator = 156.66-5.66 = 151kW
Maximum power factor possible = 151/180 = 0.84
2. DG set is operating at 600 kW load with 450°C exhaust gas temperature. The DG set generates 8 kg of exhaust gas/ kWh generated. The specific heat of gas at 450°C is 0.25 kcal/ kg°C. A heat recovery boiler is installed after which the exhaust temperature drops to 230°C. How much steam will be generated at 3 kg/ cm? with enthalpy of 650.57 kcal/ kg. Assume boiler feed water temperature as 80°C.
Ans:
Waste Heat Recovery = 600 kWh x 8 kg gas generated/ kWh output x 0.25 kcal/kg °C x (450°C- 230°C) =2,64,000 kcal/hr
Steam generation = 2,64,000 kCal/hr / (650.57 — 80) = 462.7 kg/ hr.
-----------------------
Comments
Post a Comment